XYZ Atom™

Engineering Grade AR™ Purpose-built for construction

The world's most accurate, construction-certified AR hardhat, delivering precision, safety, and millimeter-perfect design visualization onsite.

Compass logo
Infrapartners logo
Cundall
Interstates
Autodesk
PM Group
Mace 1
GF
Dornan

Introducing

The world's only
engineering grade augmented reality
system for construction

Atom - Engineering Grade AR

The Atom™ is a powerful, custom-built engineering tool combining a construction safety headset, augmented reality displays and in-built computing power.  With the Atom, construction teams can view and position holograms of 3D design models to millimeter accuracy onsite.

grab a brochure


Validation

Accuracy
Is Everything

Benefit from unrivaled precision onsite and position design models to millimeter accuracy.

Set out

Safety
Certified

Safety certified PPE with added protection and comfort built in.

BSI / ANSI Certified

Improve

Supreme Performance

Instantly view, load and interact with hyperscale 3D models anywhere onsite with zero lag.

A more efficient way
of working

This team saved $4.14M Saved in Rework costs alone

Read the case study

Let's talk 
performance

The XYZ Atom™ is the most powerful augmented reality tool designed for construction. It can store and load complex models with speed and ease.

grab a brochure

Processing 50px

Processing

Intel i7 Quadcore processing power, ultrafast 1TB storage and 16GB RAM

Power 50px

Power

Superior power performance for all day use out onsite

Optics 50px

Optics

Best-in-class optical displays with world-class field of view

Wifi 50px

Wireless

Connect to WiFi, Bluetooth and peripheral devices

Frequently asked questions about Atom:

We use a fixed-based coordinate system that enables us to anchor the models in the exact position in which they have been designed to mm accuracy. These coordinate points are marked using reflective targets.

Hand gestures were tested initially when designing the Atom, however, using the controller enables us to precisely select and measure objects within the model. Hand gesture control is also not conducive to the construction environment as health and safety gloves need to be worn onsite in many countries as a requirement.

Models are directly exported from Revit, using the custom XYZ plugin. The Plug-in enables the user to directly export the model to the XYZ Platform and upon syncing Atom, the latest models will be downloaded from the cloud and stored in the headset - the models can then be used online or offline.

Looking down AR Cropped

$4.14M in Avoided Rework: The Power of Proactive Construction Tech

A major data center project leveraged XYZ’s real-time project controls and Atom™ AR headset to detect and resolve clashes early. The result? $4.14 million in avoided rework costs and a streamlined, risk-free construction process.

Read the case study

Campaign model

Eliminating Rework: 5X Faster Unistrut Installation

In mission-critical construction, mistakes are expensive. Thanks to early issue detection and proactive planning, specialty contractors installed Unistrut structures 500% faster, reducing costly delays and accelerating project completion.

Read the case study

HPC Walking away hero compressed

Avoiding a Six-Week Delay with Project Controls

Building a data center is a high-stakes endeavor where even minor setbacks can have significant financial implications. The complexity of these projects means that mistakes, if undetected, can quickly lead to cascading delays that are hard to recover from.

With real-time project monitoring, one data center owner was able to track progress accurately, identify risks in advance, and implement corrective actions before delays could escalate. The result? A six-week delay avoided and a project that stayed on schedule.

Read the case study

$14bn

Combined project value

$135m+

Rework costs avoided

+15k

Critical days saved

+320K

Program hours saved
Adobe Stock 310360177

What our partners say

“XYZ continuously supported our project...saving us and the client cost, and program whilst improving quality and culture with our supply chain.”

Raluca Bahnean
Mace

“XYZ have changed the way we work. These are insights we have just never had before. The detail is incredible with actual real-time information.”

Director
Global Data Center
Asset Owner

“I love the objective data, it’s what gives me ultimate confidence and delivers project assurance across our sites.”

Global Executive
Global Asset Owner
Data Center

“This collaboration has already yielded incredible results, enhancing our precision and efficiency while significantly reducing rework and delays.”

John Molgaard
Senior Project Manager
Interstates

“This is the first time we have actually delivered a project on schedule in 20 years.”

Director
Global Asset Owner
Data Centers

“XYZ are solving for time, cost and quality. It does exactly what we say we are trying to do for the customer as well - reduce the pain points.”

Oz Nicco-Annan
CFO
Infrapartners

“This proved to be a gamechanger on our project. I will be hesitant to do another Data Center build without XYZ as part of the team.”

Tylor Horton
Project Manager
Interstates

“We have seen a huge impact on the culture of quality and delivery across the entire site.”

Project Manager
Global Data Center
Asset Owner

“The first supplier we onboard on every one of our new projects is XYZ.”

Michalis Grigoratos
CEO
Infrapartners

“Their technology is assessing actual installation accuracies to design tolerances... A an extremely valuable time saving method is assessing quality build.”

Patrick Sheehan
MEP Manager
Mace

“It is a gamechanger. It helps us with constructability, it helps us build safer and fast.”

Paschal McErlean
Construction Manager
PM Group

Project Controls

Find out more

Progress Tracking

Find out more

Quality Control

Find out more

Engineering Grade AR™

Find out more

Compass logo
Infrapartners logo
Cundall
Autodesk
Interstates
PM Group
Mace 1
GF
Dornan